Supply pipe for the district heating network for the Stadtwerke München

Specifications: Supply pipe in KMR DN 400/DA 560 over a length of approx. 280 mapprox. 1,400 m³ excavationBuilding depth: approx. 3 mInstallation of... [more]



Repairs to the underground car parks Am Frauenfeld, Oberschleißheim

Specifications:Three identical 24-space underground car parks in Oberschleißheim underwent comprehensive refurbishment work in three sections over 15... [more]



SW Straubing skeleton contract, Straubing

Specifications: Underground work/installation for electricity, gas, water and heat conduction linesPreparation for connecting houses to... [more]



110 kV cable connection transformer station Munich airport

Specifications: Underground work for 110 kV route, length = 3,750 metresLaying of a cable protection pipe PEHD Da 110 mm length = 3,750 metresLaying... [more]



Conversion of the kitchen of the Airbräu eatery at Munich airport

Specifications:The Airbräu eatery planned new kitchen equipment and took this opportunity of refurbishing the whole place without closing the... [more]



Barrier-free extension of the Vilshofen railway station

Specifications: Barrier-free extension/conversion of the central platform including lift and repairs to the platform roof, including removal of the... [more]



Noise protection wall on the B174 near Gornau

Specifications:Erection of a noise protection wall made of highly absorbent concrete elements and transparent, absorbing noise protection elements... [more]