Civil engineering references

Remediation of Otto Brenner bridge across Frankenschnellweg

Description of works: The order included the major repair of the Otto-Brenner Bridge, including the ramp structures. The repair was required,... [more]



Repair of underground car park, Sartrouville Platz, Waldkraiburg

Description of works: Repair of the damaged floor and base areas while use of the underground car park continued. Technical details / construction... [more]



A4 Eisenach-Görlitz motorway noise-protection wall

Description: Noise-protection wall made from precast concrete units, highly absorbent on one side, on the A4 Eisenach-Görlitz motorway, as... [more]



A3 Frankfurt - Würzburg noise-protection wall

Description: Highly absorbent noise-protection wall made from precast concrete units on the  A3 Frankfurt - Würzburg motorway as part of... [more]



Südrandstraße - Leonberg noise-protection wall

Technical details: Wall elements: 3500 m² concrete units (one side highly absorbent, other side absorbent)multi-coloured, architectural design with... [more]



Metzingen noise-protection wall

Technical details: Wall units: Timber elements, highly-absorbent on one side, on concrete base socle, acrylic-glass elementsFoundation: Ramming... [more]



A73 Reundorf noise-protection wall

Technical details: Wall units: Concrete elements, highly-absorbent on one side, with adjoining resident-sided structuring of wood. Aluminum special... [more]



Corporate Video