Civil engineering references

A66 Diedenbergen noise-protection wall

Technical details: Wall units:Concrete elements, highly-absorbent on one side, with colored structuring on both sidesFoundation: Ramming... [more]



A6 Rauenberg noise-protection wall

Technical details:  Wall elements: Aluminium box units on concrete base, highly absorbent on one side, with coloured design on both sides... [more]



Waste water and drinking water supply Bad Birnbach/Tattenbachtal

Service description: Main water supply DA 63 to DA 250: 9000 mWater supply house connections: 140 ItemsPressure-boosting station water supply: 1... [more]



B85 Cham noise-protection wall

Description of works: In 2007, as part of the construction project to widen the B85 trunk road to 4 lanes between Cham and Roding, the State... [more]



B15 Bridges over the A93 with AS Saalhaupt

Service description: In the year 2006 the Autobahn Head Office of southern Bavaria, Regensburg Service Agency, instructed Josef Rädlinger... [more]



Walkway and cycle path bridge over the Iller river

Service description: Within the framework of the upper Iller high-water protection, the B19 north of Immenstadt and south of Kempten will be... [more]



Retaining walls along the Tegernseer Landstraße / "MacGraw-Graben" trench in Munich

Service description: The "MacGraw-Graben" trench in Munich, constructed in 1971, is one of the large construction sites of Rädlinger civil... [more]



Corporate Video