Repair of underground car park, Bundesagentur für Arbeit in Regensburg

Description of works:

Complete remediation of the underground car park while maintaining operation of the car park.

Technical details / construction work:

Remediation of underground car park:

  • Partial removal of bonded screed / laying a new bonded screed: 1750 m²
  • Partial removal of reinforced concrete ground slab / remediation of reinforced concrete ground slab: 1750 m²
  • Waterproofing the screed with BEL B 1 and mastic asphalt, total area: 5600 m²
  • Protection of the base areas of walls and columns with OS C system: 500 m²
  • Remediation of joint between wall and ground slab: 150 m
  • Painting & decorating and marking work 3100 m²

Remediation of ramp - underground car park entrance and exit:

  • Concrete removal total area and in wall area: 220 m²
  • Remediation of the concrete ground slab: 220 m²
  • Waterproofing with BEL B 1 and mastic asphalt in gradient: 220 m²
  • Protection of the wall areas with an OS C system: 300 m²
  • Dismantling and installing new ramp heating: 220 m²
  • Installation of a new barrier system with induction loops: 2

Construction period: 26/07/2010 to 01/08/2011

Client: Bundesagentur für Arbeit, Nuremberg