Repair of underground car park, Sartrouville Platz, Waldkraiburg

Description of works:

Repair of the damaged floor and base areas while use of the underground car park continued.

Technical details / construction work:

  • Cut out ground slab by up to 5 cm: 2441 m²
  • Break out concrete of wall base using high-pressure water jets: 181 m²
  • Break out concrete, ceiling slab: 10 m²
  • Lay concrete on the ground slab: 169 m²
  • Make sprayed concrete for the repair: 191 m²

Construction period: July to December 2009

Client: Stadt Waldkraiburg, Tiefbauverwaltung

 


Corporate Video

 


Civil engineering references