High-pressure gas pipeline for Netze BW in Neuhausen auf den Fildern

Description of works:

Construction of high-pressure gas pipeline, involving the following services:

Civil engineering and pipeline construction

  • Pipeline trench as per DIN 4124: 200 m in length + 160 m contract extension
  • High-pressure gas pipeline DA280 PE pressure level DP4: 200 m in length + 160 m contract extension
  • Civil engineering of start/end trench for wash boring DA280 PE: 80 m in length
  • Wash-boring operations: 80 m in length
  • Pipeline construction including all required pressure tests, integrations and documentation

Construction period: September to November 2014

Client: Netze BW GmbH

Corporate Video


Civil engineering references