Barrier-free conversion of the railway stations at Benediktbeuern and Kochel

Specifications:
Barrier-free conversion of the outer platform over a length of 155 m and at a height of 76 cm above the top edge of the rails.

Execution:
Benediktbeuern:

  • Use of modular prefabricated part systems with EBA approval including planning, proofs of stability, execution and detailed planning
  • Foundation: Reinforced concrete head beams on drilled pile foundation diameter 620 mm, length approx. 10 m
  • Complete platform fittings: Tactile guiding system, weather protection, lighting, sound system, electrotechnical systems, draining systems, underground cabling work

Kochel:

  • Use of modular prefabricated part systems with EBA approval including planning, proofs of stability, execution and detailed planning
  • Foundation: Reinforced concrete head beams on drilled pile foundation diameter 620 mm, length approx. 10 m
  • Complete platform fittings: Tactile guiding system, weather protection, lighting, sound system, electrotechnical systems, draining systems, underground cabling work

Construction period: July 2013 – August 2013


Corporate Video

 


Civil engineering references