Supply pipe for the district heating network for the Stadtwerke München

Specifications:

  • Supply pipe in KMR DN 400/DA 560 over a length of approx. 280 m
  • approx. 1,400 m³ excavation
  • Building depth: approx. 3 m
  • Installation of asphalt: approx. 800 m³
  • Installation of ductwork: approx. 400 m
  • Crossing underneath a pedestrian tunnel with 6 m protective pipe DN 800 at a depth of approx. 4.5 m
  • Moving the bus stop
  • Use of 60 m heavy decks

Construction period: May to August 2014

Client: Stadtwerke München


Corporate Video

 