Repair references

Remediation of Otto Brenner bridge across Frankenschnellweg

Description of works: The order included the major repair of the Otto-Brenner Bridge, including the ramp structures. The repair was required,... [more]



Repair of underground car park, Sartrouville Platz, Waldkraiburg

Description of works: Repair of the damaged floor and base areas while use of the underground car park continued. Technical details / construction... [more]



Retaining walls along the Tegernseer Landstraße / "MacGraw-Graben" trench in Munich

Service description: The "MacGraw-Graben" trench in Munich, constructed in 1971, is one of the large construction sites of Rädlinger civil... [more]



Repair A8 Rohrbach bridge

Construction maintenance repair, widening of the superstructure: The traffic loading in this route section is approx. 150,000 motor vehicles/day.... [more]



Raising and repairing the bridge across the Tiroler Achen

Description of works: The original level of the bridge between Staudach and Grassau is too low for the necessary flow in the event of flooding. The... [more]



Displaying 15 to 19 of 19
<< First < Previous 1-7 8-14 15-19 Next > Last >>

Corporate Video