
Traffic route construction references
Service description: Rädlinger carried out the complete extension, the superstructure reinforcement and the widening of the FO 23 district road... [more]
Service description: Mastic asphalt was used for the first time in Upper Franconia during the renovation of the A9 between Naila and Münchberg. The... [more]
Service description: As part of the extension of the B286 near Rüdenhausen, Rädlinger created two new local connections to the Lower Franconian... [more]
Service description:Renovation of a 1.1km-long section of the HO 11 between Rudolphstein and Tiefengrün with overlay resurfacing. Additional... [more]
Service description:New construction of a 600m-long state road, which the Rädlinger team was able to complete one month before the completion date... [more]
Service description:New construction of the state road from Heimhof to the national border with a route length of approx. 4,220m and a link to three... [more]
Service description: Redesigning of Rosenstraße and Alrunastraße with the following services: Road and surrounding area design (lighting,... [more]