Traffic route construction references

FO 23 district road Türkelstein – Hartenreuth

Service description: Rädlinger carried out the complete extension, the superstructure reinforcement and the widening of the FO 23 district road... [more]



Renovation of A9 Naila - Münchberg

Service description: Mastic asphalt was used for the first time in Upper Franconia during the renovation of the A9 between Naila and Münchberg. The... [more]



B286 Rüdenhausen

Service description: As part of the extension of the B286 near Rüdenhausen, Rädlinger created two new local connections to the Lower Franconian... [more]



District road HO 11 Rudolphstein – Tiefengrün

Service description:Renovation of a 1.1km-long section of the HO 11 between Rudolphstein and Tiefengrün with overlay resurfacing. Additional... [more]



New construction of state road St 2154 Flossenbürg – Silberhütte

Service description:New construction of a 600m-long state road, which the Rädlinger team was able to complete one month before the completion date... [more]



New construction of Bärnau ring road

Service description:New construction of the state road from Heimhof to the national border with a route length of approx. 4,220m and a link to three... [more]



Rosenstraße and Alrunastraße in Cham

Service description: Redesigning of Rosenstraße and Alrunastraße with the following services: Road and surrounding area design (lighting,... [more]



Displaying 8 to 14 of 33

Corporate Video